Chettinad Cement Corporation Limited

Category -B

Project type- 3. Materials Production

Project Sub type- 3 b) Cement Plants and 1 d) Thermal Power Plants

Project Details - Public Hearing for the proposed grinding unit has an installed capacity of 2 x 2 MTPA with Bulk. Loading Terminal Facility and 2 x 50 MW Captive Power Plant. Impact on water environment: The quantity of water required for the proposed plant is 1840 m3/day. The water requirement of 600 m3/day for the proposed unit will be met from the bore wells initially and then from Bhīma River (19 km, S).Once the plant becomes operational, noise will be generated from the cement mills, packing unit, conveyors etc. In case of captive power plant noise generating stationary sources from the power plant will be pumps, compressors along with cooling tower and boilers.

Location of the Project - Post Ahuj Taluka South Solapur, District Solapur, Maharashtra

District- Solapur

State- Maharshtra

Date & Time: 02-04-2013 11:00 hrs

Venue: Chettinad Cement Corporation Limited, Post Ahuj, Taluka South Solapur, District Solapur Maharashtra

More information:

Notice on PCB site (English)

Download Notice (English)

Notice on PCB site (Local Language)

EIA Executive Summary English

EIA Executive summary on the PCB site (English)

From eRc Desk

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
SC cancels 214 of 218 coal block allocations Reports says exempted coal blocks include...
High Level Committee - Consultation in Bihar   High Level Committee Consultations – Mere...
HLC Odisha Interaction – Article in Odisha Diary 15092014 Odisha: Members of Civil Society Appraises the...
Amendment of Forest (Conservation) Rules       The Ministry of Environment and...

 eRc is a Resource and Response Centre that keeps a watch on the Environment Impact Assessment (EIA) processes and ensures that the impact of developmental activities on India's Environment and Communities is properly accessed and accounted for. Know More

Subscribe to eRc News

Enter your email address:


 


 

 We are on Facebook!

From eRc Desk

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
SC cancels 214 of 218 coal block allocations Reports says exempted coal blocks include...
High Level Committee - Consultation in Bihar   High Level Committee Consultations – Mere...
HLC Odisha Interaction – Article in Odisha Diary 15092014 Odisha: Members of Civil Society Appraises the...
Amendment of Forest (Conservation) Rules       The Ministry of Environment and...

 We are on Facebook!